Bekendtgørelse om frivillig forudgående gennemsigtighed · 17. juni 2026

Superheater outlet steam headers at Avedøre Power Plant in Denmark.

Ørsted Bioenergy & Thermal Power A/S offentliggjorde 17. juni 2026 en bekendtgørelse om frivillig forudgående gennemsigtighed om »Superheater outlet steam headers at Avedøre Power Plant in Denmark.«. Den samlede kontraktværdi er 7.300.000 kr.

Type
Bekendtgørelse om frivillig forudgående gennemsigtighed
Ordregiver
Ørsted Bioenergy & Thermal Power A/S
By
Fredericia
Offentliggjort
17. juni 2026
Kontrakttype
Varer
Procedure
Udbud med forhandling uden forudgående offentliggørelse
Kontraktværdi
7.300.000 kr.
CPV-koder
42162000
Udførelsessted (NUTS)
DK012
TED-nummer
416067-2026

Beskrivelse fra ordregiveren

The contract covers manufacture, testing and delivery of replacement outlet steam headers, transition pieces and part of connection tubes or the superheater HT3 outlet located at Avedøre Power Plant. The replacement is required following a steam leak incident and subsequent inspections where cracking indications were identified in dissimilar metal transition welds at the superheater HT3 outlet. The replacement is intended to restore pressure integrity and reduce the risk of further high pressure steam releases. A steam header is a thick walled manifold/collector that gathers steam from multiple tubes and distributes it onward, operating at very high pressure and temperature. Specifically, the contract covers the following supplies and services: Supply: • Complete 28 outlet headers according to BWE’s drawings, including transition pieces and part of connection tubes • Manufacturing activities including design, materials, welding, NDT, pressure testing and delivery Services: • Detail engineering • Supply of materials • Production and welding • Project management • PTS for purchase of materials • PMA for ASME SA-335 gr. P92 • PMA for ASME SA213 TP347HFG (if needed) • Heat treatment • NDT inspection according to WTP and applicable boiler standards (as per DKF) • Pressure testing • NoBo inspection • Workshop visits during manufacturing • FAT supervision • Temporary corrosion protection • Transportation to site

Andre bekendtgørelser fra Ørsted Bioenergy & Thermal Power A/S

Kilde

Bekendtgørelsen er offentliggjort i TED (nr. 416067-2026). Teksten er ordregiverens egen. Udbudsmaterialet og eventuelle rettelser findes hos ordregiveren eller i TED. Genbrug med kildeangivelse (Kommissionens afgørelse 2011/833/EU).