CAR/EAR insurance for the construction & installation of the new UNICEF Campus 4 warehouse

CPH City & Port I/S (By og Hac offentliggjorde 19. maj 2025 en udbudsbekendtgørelse om »CAR/EAR insurance for the construction & installation of the new UNICEF Campus 4 warehouse«. Den anslåede værdi er 4.000.000 kr.

Type
Udbudsbekendtgørelse
Ordregiver
CPH City & Port I/S (By og Hac
By
København K
Offentliggjort
19. maj 2025
Kontrakttype
Tjenesteydelser
Procedure
Udbud med forhandling
Anslået værdi
4.000.000 kr.
CPV-koder
66000000, 66500000, 66510000
TED-nummer
320677-2025

Beskrivelse fra ordregiveren

The project UNICEF Campus 4 comprises the construction of a new distribution center to replace UNICEF's existing facilities at Oceanvej in Nordhavn, Copenhagen. In general, UNICEF Campus 4 consists of the following facilities divided as follows between the MHE Contractor (MHC) and a design and build construction contractor (“Design and Build Contractor”): • Material Handling Equipment (MHE): The MHC shall perform the full material handling solution, including the two high-bay warehouses, automation in the backbone and in the low-bay warehouse all supported by an integrated WMS. MHC shall also provide a clack-rack solution for the two high-bay warehouses. • Design and build construction (BYG/CWC): The Design and Build Contractor shall perform the construction of the administration building (headquarters), a low-bay warehouse with associated administration, backbone building and sprinkler reservoir, electrical building and other minor buildings, and base slabs for the two high-bay warehouses. This procurement procedure regards a contract for a project specific Construction All Risk (CAR) & Erection All Risk (EAR) insurance for the construction and installation of the new UNICEF Campus 4 warehouse. The insurance shall cover both the construction and civil works (under the CWC/BYG contract) and the material handling works (under the MHE contract). The insurance is to be primary to other insurances and provide coverage to property damage to the works, property damage to existing property and liability for third party property damage and bodily injury. The estimated price/premium for 100% capacity for Construction All Risk (CAR) & Erection All Risk (EAR) insurance in the contract period is estimated to be between DKK 4-6 million.

Andre bekendtgørelser fra CPH City & Port I/S (By og Hac

Kilde

Bekendtgørelsen er offentliggjort i TED (nr. 320677-2025). Teksten er ordregiverens egen. Udbudsmaterialet og eventuelle rettelser findes hos ordregiveren eller i TED. Genbrug med kildeangivelse (Kommissionens afgørelse 2011/833/EU).